Breadcrumb

[N17-02] Allogeneic stem cell transplantation in aggressive B-cell non-Hodgkin lymphoma and in T-cell non-Hodgkin lymphoma

Overview

Overview

Commission: Commission awarded on 2017-03-16 by the Federal Joint Committee (G-BA)
Status:Preliminary report published
Department/Division:Non-Drug Interventions
Current document:PDF Preliminary report  [PDF, 3 MB] (German version) Further documents
Contact address:to the contact form

Start of comments procedure

The commenting procedure has started. If you would like to submit a comment, please send this comment to berichte@iqwig.de by Aug 14, 2018, 12:00 PM

There are formal requirements attached to the submission of comments. Therefore, please consider the information on the commenting procedure on our website and the "Checklist: Formal requirements for the submission of comments and the scientific debate".


Report documents

Report documents

PublishedDocumentSizeType 
2018-07-17 Preliminary report (German version) 3 MBPDFdownload file
2017-09-27 Report plan version 1.0 (German version) 221 kBPDFdownload file
2017-09-27 Documentation and evaluation of comments on the preliminary report plan (German version) 803 kBPDFdownload file
2017-06-20 Preliminary report plan (German version) 196 kBPDFdownload file


Timetable

Timetable

StageDateiCal
Publication of the preliminary report plan www.iqwig.de 2017-06-20  
Hearing (written comments) on the preliminary report plan www.iqwig.de 2017-06-20  to   2017-07-18 (12:00)
Scientific debate on unclear aspects in the written comments (did not take place) www.iqwig.de 3 rd quarter 2017  
Publication of the report plan version 1.0 www.iqwig.de 2017-09-27  
Publication of the preliminary report www.iqwig.de 2018-07-17  
Hearing (written comments) on the preliminary report opens www.iqwig.de 2018-07-17  
Hearing (written comments) on the preliminary report closes www.iqwig.de 2018-08-14 (12:00)  
Scientific debate on unclear aspects in the written comments (if necessary) www.iqwig.de 3 rd quarter 2018  
Forwarding of the final report to the Federal Joint Committee (publication generally 8 weeks later) www.iqwig.de 3 rd quarter 2018  


Save result list

To save your search result, please copy the link below and paste it into a new tab/window.

close